Friday, September 19, 2014

Baby is Home

Towed my Roadster home yesterday. Now is time to figure out the best layout of all the components to keep things clean and tidy. It may take some time because I need to do this only once. In the motor compartment will pretty much be the controller and motor. Everything else will reside elsewhere. I hope to have some goodies up front in the storage box next to the battery box. I will need to do this DC DC thing so I think I will set it up in that box. Away from the motor and controller. Photos are from the iPhone this morning but better will be coming later. I am going to do a movie and will show what will be in the compartment and what will be behind the compartment. All main wiring will be routed behind the aluminum out of sight. I will still do a clean zip tie job on the wiring. I don't want excess wires showing. I will ask for help in the design. You can all participate in making this a truly one of a kind build. I think I may counter sink the bolts and replace them with flush mount stainless phillips head so the whole thing looks smoother and cleaner. I won't be grinding all the welds.

What do you all think so far?









No comments:

Post a Comment